हमारी मूवी और वीडियो लाइब्रेरी को केवल सदस्यों द्वारा ही स्ट्रीम या डाउनलोड किया जा सकता है
मुफ़्त ➞ के लिए देखना जारी रखेंसाइन अप करने में तब कम से कम 1 मिनट लगता है तब आप अनलिमिटेड मूवीज और टीवी टाइटल का आनंद ले सकते हैं।
On the Critical Path (1971)
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
शैली: Documentary
कास्ट:
कर्मी दल: Dennis Sawyer (Producer), Kenneth McCready (Script), Bernard Bordeleau (Sound Editor)
Subtitle: ETC.